Are you looking for a full-time job, an internship, a student job or simply a new challenge?
Did you know that:
- The Mesgi’g Ugju’s’n (MU) wind farm was developed by PEMU s.e.c., a partnership between the (3) Mi’gmaq First Nations communities – Gesgapegiag, Gespeg and Listuguj, and Innergex Renewable Energy?
- The wind farm has a total of 47 wind turbines with a total installed capacity of 150 MW, which can produce enough electricity to power approximately 30,000 households? The access is located about 26 km from Listuguj and about 50 km from Gesgapegiag.
- The repair and maintenance of the wind turbines is accomplished by a team of wind turbine technicians that you could be part of.
- If you don’t have all the required necessary skills, we could help you get the support and training you need to work in this field.
Our technicians are people who:
- Demonstrate an interest in wind energy and electricity;
- Want to learn more about wind energy;
- Enjoy doing manual work and are resourceful;
- Have a great ability to work under pressure;
- Act safely at all times;
- Work outdoors in a variety of weather conditions;
- Work at heights;
- Are available to work overtime and be on call, when required;
- Seek challenges;
- Have the opportunity to take continuing technical training;
- Are willing to learn some workplace French, if necessary.